One January 2026 company response acknowledged that further work should not have proceeded without explicit authorisation.
One isolated public exception; not a claim about normal service or current internal systems.PREPARED FOR PRO DRAINAGE / CHECKED 18 AUG 2026
Change work only when the record agrees.
Prevent disputed additional work from becoming a refund, complaint or invoice mismatch.
A synthetic, clickable explanation of one narrow protection: when an engineer finds work outside the agreed scope, stop, show the evidence and price consequence, then record the customer's choice.
A fictional browser demo of agreed scope → new evidence → customer yes or no → matching invoice limit.
It is not connected to Pro Drainage and makes no technical, pricing or legal decision.Unclear approval for added work, a later dispute about the maximum price, or an invoice line with no matching decision.
These are outcomes to test in discovery, not measured claims about Pro Drainage.INITIAL SCOPE / CUSTOMER COPY
Jet and inspect accessible kitchen branch
- IncludedWater jetting and camera inspection
- MaximumUp to £240 inc. VAT — illustrative
- ExcludedExcavation, pipe replacement, reinstatement
ENGINEER FIELD NOTE
Condition extends beyond the authorised task
During inspection, the camera could not pass a deformed section beyond the accessible branch. Further exposure is outside the original scope. Work is paused pending a customer decision.
Observation only — not an AI diagnosis or technical conclusion.
CHANGE ORDER CO-0719-01
Expose one metre for manual confirmation
Access is required to confirm the observed condition.
Lift access area, expose up to 1m, inspect and make safe.
Replacement, final repair and decorative reinstatement.
04 / CUSTOMER YES OR NO
Do you authorise this additional work up to £680?
Approving raises the maximum authorised total to £920. Declining keeps the maximum at £240 and records that no extra work may proceed.
DEMO ONLY · NO MESSAGE, CHARGE OR SIGNATURE IS CREATEDSHARED HISTORY / VISUAL DEMO
Who agreed to what, and when
The customer and office would see the same chronological record.
- SCOPE-01Initial scope authorised
Illustrative customer confirmed jetting and inspection with a £240 maximum.
- FIELD-02Additional condition recorded
Engineer paused the workflow and added an evidence placeholder.
- CO-03Change order issued
Maximum added price of £680 presented; no additional work authorised yet.
*Visual simulation only. A production version requires authenticated identities, server timestamps and genuinely append-only storage.
INVOICE TOTAL CHECK / DEMO
The invoice limit follows the recorded choice
SIX PLAIN PILOT CHECKS
What a working production pilot must prove
Each business rule has a visible pass condition — not a subjective design promise.
Price, included work and exclusions remain available.
A change cannot be offered without a reason and evidence.
Approve and decline create different, time-stamped records.
The added task stays blocked until approval is recorded.
The invoice limit cannot exceed the recorded decision.
Customer and office can retrieve the same record.
WHAT REMAINS HUMAN
What this demo does not decide
- No AI diagnosis
- No automatic pricing
- No legal conclusion
- No real customer data
- No live message or invoice